are an important part of the finish of a pool. But in order to get them right the process starts much earlier on.
need to be precisely located...
...level with one another...
...and almost level with the top of the coping. The pool deck slopes away from the pool so the anchor cup needs to as well.
has a jig that needs to be bonded and set to the proper height and setback...
...and buried in a "cow patty" before the pool deck is poured.
Yay! It works!